Weekly Schedule Table - Vodavi STARPLUS STSe Operation Manual

Starplus stse key systems
Hide thumbs Also See for STARPLUS STSe:
Table of Contents

Advertisement

Programming LCR Tables

Weekly Schedule Table

Description
The Weekly Schedule Table determines what Time Period Route List to use within the Route
List Table. When a call is placed and ultimately sent to a route list (call is not denied) based on
the time of day the call is placed, the Daily Start Time Table selects the time period to
reference in the Weekly Schedule Table.
The Time Period Route entered for the specified time period, as determined in the Daily Start
Time Table and based on the day of week, is then selected and the call ia routed according to
the specified Time Period Route List.
EXAMPLE -- If a call is placed at 5:45 pm on a Monday, then according to the Daily Start Time
Table (using default values) the entry for time period two of the weekly schedule is checked.
Because it is Monday the entry for time period two on Monday is used and the result is that
the Time Period Route List number two (again using default values) is used for all routes.
Thus, the call is routed according to the entries in Time Period Two Route List no matter what
route (00–15) is selected.
Programming Steps
1. Press the WEEKLY SCHED flexible button (FLASH 75, Button #7). The following message
displays:
2. Press the HOLD button after each complete daily entry. A confirmation tone sounds and
the display updates.
STARPLUS STSe - Programming & Operations Manual
Figure B-3: Daily and Weekly Start Time Table
W E E K LY S C HE D U L E TA B L E
E N T E R D T T T T HOL D
D = Day of the Week:
[0] thru [6] = Monday thru Sunday
T = Time Period Route List (1-4) to use for the time-of-day (based on the Daily Start Time
table). Enter values for all time periods specified in the Daily Start Time table for that day.
1st T = Time Period Route List for first Daily Start Time (applies to all Route List tables).
2nd T = Time Period Route List for second Daily Start Time (applies to all Route List tables).
3rd T = Time Period Route List for third Daily Start Time (applies to all Route List tables).
4th T = Time Period Route List for fourth Daily Start Time (applies to all Route List tables).
Appendix B - Least Cost Routing
August 2005
B-13

Hide quick links:

Advertisement

Table of Contents

Troubleshooting

loading

Table of Contents