When leaving TESTMODE, all blockings are removed (except for functions that have
their block input active), and the IED resumes normal operation. However, if during
TESTMODE operation, power is removed and later restored, the IED will remain in
TESTMODE with the same protection functions blocked or unblocked as before the
power was removed. All testing will be done with actually set and configured values
within the IED. No settings will be changed, thus mistakes are avoided.
Forcing of binary input and output signals is only possible when the IED is in IED test
mode.

Function block

TESTMODE
IED_TEST
TEST
IED_TEST
BLOCK
NOEVENT
INPUT
SETTING
IEC61850
IEC14000072-1-en.vsd
IEC09000219 V2 EN-US
Figure 297:
TESTMODE function block
Signals
Table 600:
TESTMODE Input signals
Name
Type
IED_TEST
BOOLEAN
Table 601:
TESTMODE Output signals
Name
Type
TEST
BOOLEAN
IED_TEST
BOOLEAN
BLOCK
BOOLEAN
NOEVENT
BOOLEAN
INPUT
BOOLEAN
SETTING
BOOLEAN
IEC61850
BOOLEAN
Default
Description
0
Activate IED test mode
Description
In test via IED TEST or via LD0 Mode
IED test mode is active
Active when LD0 is blocked or test blocked
Event disabled during test mode
IED TEST input is active
IED test mode setting is Enabled
Active when LD0 Mode is in Blocked, Test or Test
blocked
Section 22
Basic IED functions
SEMOD54888-4 v5
IP9680-1 v2
PID-6730-INPUTSIGNALS v1
PID-6730-OUTPUTSIGNALS v1
777

Advertisement

Table of Contents
loading

Table of Contents