Sign In
Upload
Manuals
Brands
ABB Manuals
Measuring Instruments
RES670 2.1
ABB RES670 2.1 Manuals
Manuals and User Guides for ABB RES670 2.1. We have
1
ABB RES670 2.1 manual available for free PDF download: Commissioning Manual
ABB RES670 2.1 Commissioning Manual (202 pages)
Phasor measurement unit
Brand:
ABB
| Category:
Measuring Instruments
| Size: 3.68 MB
Table of Contents
Table of Contents
7
Section 1 Introduction
15
This Manual
15
Intended Audience
15
Product Documentation
16
Product Documentation Set
16
Document Revision History
17
Related Documents
18
Document Symbols and Conventions
18
Symbols
18
Document Conventions
19
IEC61850 Edition 1 / Edition 2 Mapping
20
Section 2 Safety Information
29
Symbols on the Product
29
Warnings
29
Caution Signs
31
Note Signs
32
Section 3 Available Functions
33
Wide Area Measurement Functions
33
Back-Up Protection Functions
33
Control and Monitoring Functions
34
Communication
39
Basic IED Functions
40
Section 4 Starting up
43
Factory and Site Acceptance Testing
43
Commissioning Checklist
43
Checking the Power Supply
44
Energizing the IED
44
Checking the IED Operation
44
IED Start-Up Sequence
45
Setting up Communication between PCM600 and the IED
45
Writing an Application Configuration to the IED
51
Checking CT Circuits
52
Checking VT Circuits
53
Using the RTXP Test Switch
53
Checking the Binary I/O Circuits
54
Binary Input Circuits
54
Binary Output Circuits
55
Checking Optical Connections
55
Section 5 Configuring the IED and Changing Settings
57
Overview
57
Configuring Analog CT Inputs
58
Reconfiguring the IED
58
Section 6 Establishing Connection and Verifying the SPA/IEC Communication
61
Entering Settings
61
Entering SPA Settings
61
Entering IEC Settings
61
Verifying the Communication
62
Verifying SPA Communication
62
Verifying IEC Communication
62
Fibre Optic Loop
63
Optical Budget Calculation for Serial Communication with SPA/IEC
63
Section 7 Establishing Connection and Verifying the LON Communication
65
Communication Via the Rear Ports
65
LON Communication
65
The LON Protocol
66
Hardware and Software Modules
66
Optical Budget Calculation for Serial Communication with LON
67
Section 8 Establishing Connection and Verifying the IEC 61850 Communication
69
Overview
69
Setting the Station Communication
69
Verifying the Communication
70
Section 9 Establishing Connection and Verifying the IEEE C37.118/1344 Communication
71
Overview
71
Setting the PMU Station Communication (PMU Report)
71
Setting the PMU Station Communication (PMU Configuration)
72
Setting the TCP/UDP Client Communication
73
Verifying the Communication
76
Verifying the IEEE C37.118/1344 TCP Communication
77
Verifying the IEEE C37.118/1344 UDP Communication
83
Optical Budget Calculation for RES670 - PDC Communication
84
Section 10 Testing IED Operation
87
Preparing for Test
87
Requirements
87
Preparing the IED to Verify Settings
89
Activating the Test Mode
90
Preparing the Connection to the Test Equipment
90
Connecting the Test Equipment to the IED
91
Releasing the Function to be Tested
92
Verifying Analog Primary and Secondary Measurement
93
Testing the Protection Functionality
94
Forcing of Binary I/O Signals for Testing
95
Forcing Concept
95
How to Enable Forcing
95
Enable Forcing by Using LHMI
95
Enable Forcing Using TESTMODE Function Block
96
How to Change Binary Input/Output Signals Using Forcing
96
Forcing by Using LHMI
96
Forcing by Using PCM600
98
How to Undo Forcing Changes and Return the IED to Normal Operation
100
Undo Forcing by Using LHMI
100
Undo Forcing by Using Testmode Component
100
Undo Forcing by Using PCM600
101
Section 11 Testing Functionality by Secondary Injection
103
Testing Disturbance Report
103
Introduction
103
Disturbance Report Settings
103
Disturbance Recorder (DR)
103
Event Recorder (ER) and Event List (EL)
104
Identifying the Function to Test in the Technical Reference Manual
105
Impedance Protection
105
Power Swing Detection ZMRPSB (68)
105
Verifying the Settings
106
Testing the Power Swing Detection Function ZMRPSB (68)
107
Testing the Tr1 Timer
107
Completing the Test
108
Testing the Block Input, Interaction between FDPSPDIS (21) or FRPSPDIS (21) and ZMRPSB (78)
108
Out-Of-Step Protection OOSPPAM
108
Verifying the Settings
109
Fwdr Fwdx
114
Test of Point RE
114
Test of the Boundary between Zone 1 and Zone 2, Which Is Defined by the Parameter Reachz1
119
Test of the Point SE (R Rvsr , X Rvsx )
123
Current Protection
128
Four Step Phase Overcurrent Protection 3-Phase Output OC4PTOC (51_67)
128
Verifying the Settings
128
Completing the Test
130
Four Step Residual Overcurrent Protection, (Zero Sequence or Negative Sequence Directionality) EF4PTOC (51N/67N)
130
Four Step Directional Ground Fault Protection
130
Completing the Test
131
Four Step Non-Directional Ground Fault Protection
131
Four Step Negative Sequence Overcurrent Protection NS4PTOC (46I2)
131
Completing the Test
132
Sensitive Directional Residual Overcurrent and Power Protection SDEPSDE (67N)
132
Measuring the Trip and Time Limit for Set Values
133
Completing the Test
139
Thermal Overload Protection, One Time Constant, Fahrenheit/Celsius LFPTTR/LCPTTR (26)
139
Measuring the Trip and Time Limit of Set Values
139
Completing the Test
140
Directional Underpower Protection GUPPDUP (37)
140
Verifying the Settings
140
Completing the Test
142
Directional Overpower Protection GOPPDOP (32)
142
Verifying the Settings
142
Completing the Test
143
Voltage Protection
143
Two Step Undervoltage Protection UV2PTUV (27)
143
Verifying the Settings
143
Completing the Test
144
Two Step Overvoltage Protection OV2PTOV (59)
145
Extended Testing
145
Verifying the Settings
145
Completing the Test
146
Frequency Protection
146
Underfrequency Protection SAPTUF (81)
146
Verifying the Settings
146
Completing the Test
147
Overfrequency Protection SAPTOF (81)
147
Verifying the Settings
147
Completing the Test
148
Rate-Of-Change Frequency Protection SAPFRC (81)
148
Verifying the Settings
148
Completing the Test
149
Frequency Time Accumulation Protection Function FTAQFVR (81A)143
149
Verifying the Settings
149
Completing the Test
151
Multipurpose Protection
151
General Current and Voltage Protection CVGAPC
151
Built-In Overcurrent Feature (Non-Directional)
152
Overcurrent Feature with Current Restraint
153
Overcurrent Feature with Directionality
153
Overcurrent Feature with Voltage Restraint
153
Completing the Test
154
Over/Undervoltage Feature
154
Secondary System Supervision
154
Current Circuit Supervision CCSSPVC (87)
154
Completing the Test
155
Verifying the Settings
155
Fuse Failure Supervision FUFSPVC
155
Checking that the Binary Inputs and Outputs Trip as Expected
155
Measuring the Trip Value for the Negative Sequence Function
156
Measuring the Trip Value for the Zero-Sequence Function
157
Checking the Operation of the DV/Dt and DI/Dt Based Function
158
Measuring the Trip Value for the Dead Line Detection Function
158
Completing the Test
159
Control
159
Single Command, 16 Signals SINGLECMD
159
Logic
160
Tripping Logic, Common 3-Phase Output SMPPTRC (94)
160
1Ph/3Ph Operating Mode
160
Three-Phase Operating Mode
160
1Ph/2Ph/3Ph Operating Mode
161
Circuit Breaker Lockout
162
Completing the Test
163
Monitoring
163
Gas Medium Supervision SSIMG
163
Testing the Liquid Medium Supervision for Alarm and Lock out Conditions
163
Breaker Monitoring SSCBR
164
Completing the Test
164
Liquid Medium Supervision SSIML
164
Testing the Liquid Medium Supervision for Alarm and Lock out Conditions
164
Verifying the Settings
165
Completing the Test
167
Event Function EVENT
167
Limit Counter L4UFCNT
167
Metering
168
Function for Energy Calculation and Demand Handling ETPMMTR
168
Pulse-Counter Logic PCFCNT
168
Verifying the Settings
168
Completing the Test
169
Station Communication
170
Multiple Command and Transmit MULTICMDRCV / MULTICMDSND
170
Remote Communication
170
Binary Signal Transfer Binsignreceive, Binsigntransm
170
Basic IED Functions
171
Parameter Setting Group Handling SETGRPS
171
Completing the Test
172
Verifying the Settings
172
Exit Test Mode
172
Section 12 Commissioning and Maintenance of the Fault Clearing System
173
Commissioning Tests
173
Periodic Maintenance Tests
173
Visual Inspection
174
Maintenance Tests
174
Preparation
175
Recording
175
Secondary Injection
175
Alarm Test
175
Self Supervision Check
176
Trip Circuit Check
176
Measurement of Service Currents
176
Restoring
177
Section 13 Troubleshooting
179
Checking the Self Supervision Signals
179
Checking the Self Supervision Function
179
Determine the Cause of an Internal Failure
179
Self Supervision HMI Data
179
General IED Status
179
Communication Diagnostics
180
Fault Tracing
186
Internal Fault Indications
186
Using Front-Connected PC
188
Repair Instruction
189
Repair Support
190
Maintenance
190
Section 14 Glossary
191
Advertisement
Advertisement
Related Products
ABB Relion RES670
ABB Relion RES670 A20
ABB Relion RES670 B20
ABB Relion
ABB ReliaMod RELBOW316N3R
ABB ReliaMod RELBOWE312N3R
ABB ReliaMod RMM BB16R
ABB ReliaMod RMM BT16R
ABB ReliaMod RMM L12R
ABB ReliaMod RMM L16R
ABB Categories
Industrial Equipment
Controller
Measuring Instruments
Battery Charger
DC Drives
More ABB Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL