ABB RES670 Technical Manual page 356

Relion 670 series, phasor measurement unit
Hide thumbs Also See for RES670:
Table of Contents

Advertisement

Section 11
Multipurpose protection
Bin input: BLKUC1TR
Selected current
PickupCurr_UC1
Operation_UC1=On
Bin input: BLKUC1
ANSI05000750 V1 EN-US
Figure 122:
Simplified internal logic diagram for built-in first undercurrent step that is, UC1 (step UC2 has the
same internal logic)
Selected voltage
PickupVolt_OV1
Operation_OV1=On
BLKOV1
ANSI05000751 V1 EN-US
Figure 123:
Simplified internal logic diagram for built-in first overvoltage step OV1 (step OV2 has the same
internal logic)
350
a
b>a
b
AND
DEF time
selected
a
a>b
b
AND
Inverse time
selected
AND
0-DEF
0
0-DEF
0
OR
Inverse
Phasor measurement unit RES670 2.2 ANSI
1MRK 511 408-UUS A
TRUC1
en05000750_ansi.vsd
BLKTROV1
TROV1
AND
PU_OV1
en05000751_ansi.vsd
Technical manual

Advertisement

Table of Contents
loading

Table of Contents