Mounting Procedure For Flush Mounting - ABB RES670 Technical Manual

Relion 670 series, phasor measurement unit
Hide thumbs Also See for RES670:
Table of Contents

Advertisement

1MRK 511 408-UUS A
23.4.1.2
23.4.2
23.4.2.1
Phasor measurement unit RES670 2.2 ANSI
Technical manual

Mounting procedure for flush mounting

4
6
IEC16000080 V1 EN-US
Figure 334:
Flush mounting details.
PosNo
Description
1
Sealing strip, used to obtain IP54
class. The sealing strip is factory
mounted between the case and
front plate.
2
Fastener
3
Groove
4
Screw
5
Joining point of sealing strip
6
Panel
19" panel rack mounting
Overview
All IED sizes can be mounted in a standard 19" cubicle rack by using a suitably sized
mounting kit consisting of two mounting angles, their fastening screws and washers.
The mounting angles are reversible which enables mounting of IED size 1/2 x 19" or
3/4 x 19" either to the left or the right side of the cubicle.
3
2
IEC16000080=1=en.vsd
Section 23
IED hardware
1
5
Quantity
Type
-
-
2
-
-
-
4
M3x8 mm
-
-
-
-
M11942-2 v5
IP10313-1 v1
SEMOD127656-5 v4
861

Advertisement

Table of Contents
loading

Table of Contents