Precautions - Mitsubishi Electric GT14 User Manual

Hide thumbs Also See for GT14:
Table of Contents

Advertisement

21.6 Precautions

Connection to FXCPU
(1) When connecting to FX
When the keyword of FXCPU (FX
set, GOT may not be able to monitoring. Perform an I/O
check again.
(
15.2.5 I/O check) When the result of the I/O
check is normal, check the status of keyword
registration.
(2) When connecting with function extension board or
communication special adapter
When a sequence program and settings that the
FXCPU communicates with devices other than the
GOT are set with software, including GX Developer, the
FXCPU cannot communicate with the GOT.
(a) Settings with sequence program
Check the sequence program and delete the
following.
FX SERIES PROGRAMMABLE CONTROLLERS
USER'S MANUAL - Data Communication Edition
• No protocol communication (RS instruction)
• Sequence program with the computer link, N:N
network, and parallel link
• Parameter setting
• Set the following special registers to 0.
Except FX
, FX
3U
FX
, FX
: D8120, D8400, D8420
3U
3UC
FX
, FX
, FX
3G
3GC
FX
: D8120, D8400
3S
(b) Settings with GX Developer
Select [PLC parameter] in [Parameter], and then
click the PLC system(2) tab on the FX parameter
screen.
Uncheck [Operate communication setting], and
then transfer the parameter to the programmable
controller. After the transfer, turn off the
programmable controller, and then turn on the
programmable controller again.
series
3
series) has been
3
: D8120
3UC
: D8120, D8400,
3GE
D8420,D8370
Connection in the multiple CPU system
When the GOT is connected to multiple CPU system, the
following time is taken until when the PLC runs.
• QCPU (Q mode), motion controller CPU (Q series):
10 seconds or more
• MELDAS C70: 18 seconds or more
When the GOT starts before the PLC runs, a system
alarm occurs. Adjust the opening screen time in the
GOT setup so that no system alarm occurs.
GT Designer3 Version1 Screen Design Manual
Connection to LCPU
LCPU may diagnose (check file system, recovering
process, etc.) the SD memory card when turning on the
power or when resetting.
Therefore, it takes time until the SD memory card
becomes available. When the GOT starts before the
SD card becomes available, a system alarm occurs.
Adjust the opening screen time in the GOT setup so
that no system alarm occurs.
GT Designer3 Version1 Screen Design Manual
Connection to basic model QCPU
Do not set the serial communication function of Q00UJ/
Q00U/Q01U/Q02UCPU, Q00/Q01CPU. If the function is
set, the communication may not be performed.
Connection to Q170MCPU
Set [CPU No.] to "2" in the device setting to monitor the
device of the Motion CPU area (CPU No.2).
When the CPU No. is set to "0" or "1", the device on the
PLC CPU area (CPU No.1) is monitored.
When the CPU No. is set to the number other than "0"
to "2", a communication error occurs and the monitoring
cannot be executed.
For setting the CPU No., refer to the following manual.
GT Designer3 Version1 Screen Design Manual
Example) Setting dialog box of the bit device
21. DIRECT CONNECTION TO CPU
21.6 Precautions
17
18
19
20
21
22
23
24
21 - 33

Advertisement

Table of Contents
loading

Table of Contents