Mitsubishi Electric GT14 User Manual page 672

Hide thumbs Also See for GT14:
Table of Contents

Advertisement

10.
Return to [PLC side I/F Detailed Setting of GOT] and
click [OK].
11.
The [Transfer Setup] is displayed. Click [Other Station
(Single Network)].
12.
Double-click [CC IE Field].
13.
[Network Communication Route Detailed Setting of
CC IF Field] is displayed.
14.
Set [Network No.] and [Station No.] assigned to the
CPU, and click [OK].
When connecting to CC-Link IE field network master/
local module of the system configuration example, the
setting is as follows.
[Network No.]: 1
[Station No.]: 0
15.
The screen returns to [Transfer Setup]. Click
to check if GX Developer has been
connected to the QCPU (Q mode).
31 - 36
31. FA TRANSPARENT FUNCTION
31.6 Personal Computer Side Setting
(1) Connecting the GOT and PLC in computer link
connection (when connecting to QJ71C24(N))
1.
Click the Connection Destination view
Destination]
[(Connection target data name)] in the
Navigation window of GX Works2.
2.
The [Transfer Setup] is displayed.
3.
Set the [Transfer Setup]:
PC side I/F: Ethernet Board
PLC side I/F: GOT
Other station: No specification
4.
Double-click [Ethernet Board] of the PC side I/F to
display [PC side I/F Ethernet Board Setting].
5.
Set the protocol to TCP. Network No. and Station No.
are not required to be changed (default) because they
are not used.
[Connection

Advertisement

Table of Contents
loading

Table of Contents