Mitsubishi Electric GT14 User Manual page 955

Hide thumbs Also See for GT14:
Table of Contents

Advertisement

Signal
name
SDA
SDB
RDA
RDB
SG
*4
For KP2000 series, the terminal No. differs according to the model.
This indicates the symbols of the position 10) (third zone) of the following models.
Model: KP2 4) 5) 6) 7) 8) 9) 10) - 12) 13) 14)
Precautions when preparing a cable
(1) Cable length
(a) The length of the RS-422 cable used for connecting
the controller to the converter
The length of the RS-422 cable must be 1200m or
less.
(b) The length of the RS-422 cable used for connecting
the controller to the GOT
The total distance (between GOT and the
controller) of the RS-422 cable must be 13m or
less.
(2) Connector conversion box side connector
For the connector conversion box side connector, refer
to the following.
6.6 Connector Conversion Box
(3) External cable side connector
For the connector specifications of the external cable
side, refer to the following.
8.2 External Cable, Relay Cable
(4) CHINO controller side connector
Use the connector compatible with the CHINO
controller side module.
For details, refer to the user's manual of the CHINO
controller.
LT300
LT400
DZ1000, DZ2000
Terminal
Terminal
Terminal No.
No.
No.
11
11
19
12
12
20
13
13
21
14
14
22
15
15
23
Controller type
DB1000
DB2000
KP1000
Terminal
Terminal
Terminal
No.
No.
No.
14
28
14
15
29
15
12
26
12
13
27
13
16
30
16
Connecting terminating resistors
(1) CHINO controller side
When connecting a CHINO controller to the GOT, a
terminating resistor must be connected to the CHINO
controller.
User's Manual of the CHINO controller
40. CONNECTION TO CHINO CONTROLLER
40.3 Connection Diagram
*5
KP2000
JU
A
C, F
Terminal
Terminal
Terminal
No.
No.
No.
28
31
1
29
32
2
26
29
3
27
30
4
30
28
5
40 - 13
40
41
42
43
44
45
46
47

Advertisement

Table of Contents
loading

Table of Contents