Checking The Project Data And Os Writing On Got - Mitsubishi Electric GT14 User Manual

Hide thumbs Also See for GT14:
Table of Contents

Advertisement

18.3.2 Checking the project data and OS writing on GOT

Confirm if the standard monitor OS, communication driver, option OS, project data, communication settings and common
settings are properly written onto the GOT by reading from GOT using GT Designer3.
For reading from the GOT, refer to the following manual.
1.
Select [Communication]
2.
The [Communication configuration] dialog box appears.
Set the communication setting between the GOT and the personal computer.
Click the [OK] button when the settings are completed.
3.
The [GOT Read] tab appears on the [Communicate with GOT] dialog box.
Select the [Drive information] radio button of the Read Data.
4.
Click the [Info Reception] button.
5.
Confirm that the project data and OS are written correctly onto the GOT.
18 - 16
18. DRAWING SOFTWARE SETTINGS (CONTROLLER SETTING AND COMMON SETTINGS)
18.3 Writing the Communication Settings and Common Settings onto the GOT
GT Designer3 Version1 Screen Design Manual
[Read from GOT...] from the menu.

Advertisement

Table of Contents
loading

Table of Contents