Rough Procedure - Mitsubishi Electric GT14 User Manual

Hide thumbs Also See for GT14:
Table of Contents

Advertisement

1.1.1

Rough procedure

The outline procedures before operating GOT and the descriptions of each item are shown below.
Install GT Designer3 in the PC.
Create project data.
Wire for the GOT power supply and the controller.
Wire for the controller power supply and I/O.
Turn on the power of GOT and controller.
Install the OS to GOT.
Check that the OS is installed to GOT.
Download project data.
Turn on the controller power and check that the GOT
recognizes the controller.
Check that the monitoring is normal.
Refer to GT Designer3 Version1 Screen Design Manual
(Fundamentals).
Refer to GT Designer3 Version1 Screen Design Manual
(Functions).
9. HANDLING OF POWER WIRING AND SWITCH
21. to 65.
Controller manuals
17. INSTALLATION OF COREOS, BOOTOS AND STANDARD
MONITOR OS
Refer to GT Designer3 Version1 Screen Design Manual
(Fundamentals).
Refer to GT Designer3 Version1 Screen Design Manual
(Fundamentals).
1. OVERVIEW
1.1 Features
1
2
3
4
5
6
7
8
1 - 3

Advertisement

Table of Contents
loading

Table of Contents