Connecting To Display I/F (Cnc C70) - Mitsubishi Electric GT14 User Manual

Hide thumbs Also See for GT14:
Table of Contents

Advertisement

Confirming the communication state of
Ethernet module
(1) When using the Command Prompt of Windows
Execute a Ping command at the Command Prompt of
Windows
.
(a) When normal communication
C:\>Ping 192.168.0.19
Reply from 192.168.0.19: bytes=32 time<1ms
TTL=64
(b) When abnormal communication
C:\>Ping 192.168.0.19
Request timed out.
(2) When abnormal communication
At abnormal communication, check the followings and
execute the Ping command again.
• Mounting condition of Ethernet module
• Cable connecting condition
• Confirmation of switch and network parameter setting
• Operation state of PLC CPU (faulty or not)
• IP address of GOT specified by Ping command
23.4.13 Connecting to Display I/F (CNC
C70)
This section describes the settings of the GOT and Display
I/F (CNC C70) in the following case of the system
configuration.
POINT
POINT
POINT
Display I/F (CNC C70)
For details of the Display I/F (CNC C70), refer to the
following manual.
C70 Series SET UP MANUAL
System configuration
 Ethernet parameter settings of FX3U-ENET-L Configuration tool
IP address settings of CNC C70
(1) Remote monitor tool
Item
IP address
Subnet mask
Gateway address
Port number
Speed auto/10M
23. ETHERNET CONNECTION
[Controller Setting] and [Ethernet] of GT Designer3
<GOT> (The settings other than the
following are set to the default)
Network No.
PLC No.
IP address
Port No.
Communication format : UDP (fixed)
<Q17nNCCPU> (The settings other than the
following are set to the default)
Network No.
: 239
PLC No.
: 2
IP address
: 192.168.0.19
Port No.
: 5001
: UDP(fixed)
Communication format
Setting necessity
Set value
at GOT connection
192.168.0.19
255.255.255.0
0.0.0.0
64758 (fixed)
0 (fixed)
: Necessary
: As necessary
: Not necessary
23.4 PLC Side Setting
17
18
19
: 1
: 1
: 192.168.0.18
20
: 5001
21
22
23
24
23 - 49

Advertisement

Table of Contents
loading

Table of Contents