Installing to/removing from panel

Installing the Connector Conversion Box (GT16H-CNB-42S) on the panel
(1) Overview
The following describes the panel processing when the GOT is installed or removed by attaching a Connector
Conversion Box to the control panel or operation panel.
Handy GOT
External cable (Connector Conversion Box connection
1)
side 42 pins)
2)
PLC connection cable
3)
Connector Conversion Box
Use the Ethernet connection cable for the PLC connection cable.
For the cable selection, refer to the following.
8. COMMUNICATION CABLE
21. to 65.
(2) Panel cutting dimensions for Connector Conversion Box
The Connector Conversion Box can be installed on the panel face directly or with mounting bracket
offered as an accessory.
For details on installing procedure and panel cutting dimensions, refer to the following.
6.6 Connector Conversion Box
3)
1)
Name
Control panel or
operation panel
PLC
2)
Refer to this section 6.6
for panel cutting dimensions.
Description
GT14H-C30-42P
GT14H-C60-42P
GT14H-C100-42P
Ethernet connection cable
GT16H-CNB-42S
7. INSTALLATION