Daihatsu 1997 Terios J100 Service Manual page 488

Table of Contents

Advertisement

(2) Place the transmission control shaft lever subassem-
bly.
(3) Push the transmission control shaft lever subassembly
toward the front side (ie: ∏ range)
(4) Back off the lever two notches to the NEUTRAL posi-
tion
(5) Remove the transmission control shaft lever sub-
assembly.
(6) Install the following SST
SST:
09302-87201-000
(7) Adjust the neutral start switch assembly until the neu-
tral basic line should be aligned with the SST above.
(8) Tighten the bolt.
Tightening Torque:
45. Tighten the transmission control shaft lever subassembly
with a nut.
Tightening Torque:
46. Install the control cable bracket. Tighten the two bolts.
Tightening Torque:
47. Secure the connectors of the neutral start switch assembly
(B) and solenoid wire assembly (A), respectively, to the
control cable bracket.
48. Installation of governor valve.
(1) Place the ball into the transmission case side cover.
14.7 - 21.6 N·m (1.5 - 2.2 kgf-m)
9.8 - 15.7 N·m (1.0 - 1.6 kgf-m)
14.7 - 21.6 N·m (1.5 - 2.2 kgf-m)
AT–87
D N
Scribed line
(B)
(A)
P
R
JAT00265-00239
SST
JAT00266-00240
JAT00267-00241
JAT00268-00242
JAT00269-00243

Advertisement

Table of Contents
loading

Table of Contents