Daihatsu 1997 Terios J100 Service Manual page 430

Table of Contents

Advertisement

(2) With a new gasket interposed, tighten the drain plug
securely.
Tightening Torque:
(3) Add new fluid through the filler tube.
Fluid To Be Used:
Full Capacity:
Drain and Refill:
(4) Start the engine. Move the shift lever to all positions
from P through L. Then, move it to the P position.
(5) With the engine idling, check the fluid level. Add fluid
up to the COLD level on the fluid level gauge.
(6) Check the fluid level at the normal fluid operating tem-
perature (70 - 90°C). Add the fluid, as required.
5. Adjustment of throttle cable
The purpose of this adjustment is to make the full open
state of the throttle link of the throttle body at the engine
side equal to the full-open position of the throttle valve in-
side the transmission.
NOTE:
Do not perform the adjustment, using the attaching nut
of the throttle link at the engine side. The nut A in the
right figure is secured with bond.
(1) Remove the neutral start switch.
(2) Reset the automatic adjusting mechanism, following
the procedure given below.
NOTE:
When turning the casing cap with pliers or the like, be
sure not to apply a lateral force. If a lateral force should
be applied, it may damage (break) the casing cap sec-
tion.
1) Turn the casing cap about 60 to 90 degrees. (The
circlip will be expanded.)
NOTE:
When turning the casing cap with pliers or the like, be
sure to clamp the hexagonal staked section of the cas-
ing cap.
2) Pull the casing cap, until it is brought into contact
with the stopper.
19.6 - 29.4 N·m (2.0 - 3.0 kgf-m)
®
DEXRON
III
Approx. 4.2 R (For EU:
Approx. 1.7 R (For EU:
4.29 R)
1.74 R)
AT–29
JAT00049-00000
A
JAT00050-00043
Hexagonal
staked section
w
Casing cap
q
Circlip
JAT00051-00044

Advertisement

Table of Contents
loading

Table of Contents