Hot Swap Installation; Hot Swap Monitoring - Safran SecureSync 2400 User Manual

Hide thumbs Also See for SecureSync 2400:
Table of Contents

Advertisement

2.9.3.1

Hot Swap Installation

Figure 2-7:
To remove a power supply, first unplug the power input to be removed. (If you
are working with a 12 V
nection from the post after disconnecting power). Then, press the lever fully
down and pull on the handle.
To install a power supply, first insert the sled until the latch clicks and the rear
panel of the supply is aligned with the rear panel of the SecureSync. (Be sure to
connect power AFTER the sled is fully inserted, and not before). Then, plug in the
power input. (If you are working with a 12 V
a grounding ring to the external post before connecting power).
2.9.3.2

Hot Swap Monitoring

After installing power supplies, functionality can be confirmed through the Web
UI, CLI, front panel, or via SNMP.
Web UI Hot Swap Monitoring
You can view the status of the power supplies through the Web UI: navigate to
MANAGEMENT > OTHER > Hot Swap:
CHAPTER
2
SecureSync 2400 User Manual Rev. 5.2
Hot Swap Power Supply installation (rear view)
DC
The
Hot Swap Overall Status
whether the unit has at least one active, valid power supply.
Green
indicates all detected power supplies are valid
The status will show
Red
if there is no single HSPS module working properly (urgent need
for replacement).
Grey
if the monitoring on both sleds has been disabled.
In this panel, you can also download (or clear) a file of the most recent mon-
itoring information for both bays.
(2-Pin) sled, you will need to remove the ground con-
DC
light at the top right of this page indicates
yellow
if one power supply is not valid.
2.9  Connecting Supply Power
(2-Pin) sled, you will also connect
57

Advertisement

Table of Contents
loading

Table of Contents