ABB CRB 1100 Product Manual page 643

Table of Contents

Advertisement

Securing the upper cable package to the axis-4 gearbox
1
Product manual - CRB 1100
3HAC078007-001 Revision: J
Action
Make sure that:
The hole on the cable protection tube is
aligned with the locking screw hole on the
gearbox.
The cable protection tube surface is com-
pletely parallel with the pulley cover at one
side and with the flange at the other side.
© Copyright 2021-2023 ABB. All rights reserved.
5.8.4 Replacing the axis-4 gearbox
Note
Holes to be aligned are shown in
the following figure.
xx1800003018
Surfaces to be paralleled are
shown in the following figures.
xx1800003019
xx1800003020
Continues on next page
5 Repair
Continued
643

Advertisement

Table of Contents
loading

Table of Contents