ABB CRB 1100 Product Manual page 197

Table of Contents

Advertisement

12
Disconnecting the connectors at the division point
1
2
3
Product manual - CRB 1100
3HAC078007-001 Revision: J
Action
Remove the timing belt from its groove on the
motor.
Action
DANGER
Make sure that all supplies for electrical power,
hydraulic pressure, and air pressure are turned
off.
Disconnect the connectors.
J2.FB3,4,5,6
J2.MP3,4,5/6
Tip
Take photos of the connector and cable position
before disconnecting them, to have as a reference
when reconnecting.
Snap loose and remove the female head of the
connectors from the connector plate.
© Copyright 2021-2023 ABB. All rights reserved.
5.3.1 Replacing the upper cable package
Note
xx1800002496
Note
xx1800002497
xx1800002498
Continues on next page
5 Repair
Continued
197

Advertisement

Table of Contents
loading

Table of Contents