ABB CRB 1100 Product Manual page 210

Table of Contents

Advertisement

5 Repair
5.3.1 Replacing the upper cable package
Continued
Separating the upper cable package from the housing
1
2
Pulling out the upper cable harness
1
Continues on next page
210
Action
DANGER
Make sure that all supplies for electrical power,
hydraulic pressure, and air pressure are turned
off.
Remove the cable bracket.
Action
DANGER
Make sure that all supplies for electrical power,
hydraulic pressure, and air pressure are turned
off.
© Copyright 2021-2023 ABB. All rights reserved.
Note
xx1800003013
xx1800003014
Note
Product manual - CRB 1100
3HAC078007-001 Revision: J

Advertisement

Table of Contents
loading

Table of Contents