ABB CRB 1100 Product Manual page 222

Table of Contents

Advertisement

5 Repair
5.3.1 Replacing the upper cable package
Continued
Securing the upper cable package to the axis-2 gearbox
1
Refitting the axis-6 motor
1
2
Continues on next page
222
Action
Refit the cable bracket.
Action
Check that:
all assembly surfaces are clean and without
damages
the motor is clean and undamaged.
Orient the motor correctly and fit it into the lower
arm.
Tip
Leave the connectors FB5 and FB6 accessible
from the process hub and the connectors MP5
and MP6 accessible from wrist side.
© Copyright 2021-2023 ABB. All rights reserved.
Note
Screw: M2.5x6 12.9 Lafre
2C2B/FC6.9 (2 pcs)
Tightening torque: 0.6 Nm
xx1800003002
Note
Motor orientation: orient the motor
according to the figure below, in
regard to the encircled motor con-
nector.
xx1800003023
Product manual - CRB 1100
3HAC078007-001 Revision: J

Advertisement

Table of Contents
loading

Table of Contents