ABB CRB 1100 Product Manual page 226

Table of Contents

Advertisement

5 Repair
5.3.1 Replacing the upper cable package
Continued
2
Refitting the process hub
1
2
3
Continues on next page
226
Action
Refit the lamp unit cover.
Action
Reconnect the lamp unit connector J5.UL and
place the connector behind the air hose connect-
ors.
Reconnect the air hoses in a cross pattern.
Tip
See the number markings on the air hoses for
help to find the corresponding air hoses.
The air hoses with the same number connect to
the same Y-shaped connector.
For robots with CP/CS cabling
Reconnect the connector.
J5.C1
© Copyright 2021-2023 ABB. All rights reserved.
Note
Lamp unit cover: 3HAC075972-001
Screw: M2x8 12.9 Gleitmo 605 (3
pcs)
Tightening torque: 0.1 Nm
xx2000002220
Note
xx1800002946
xx1800002945
xx2100000293
Product manual - CRB 1100
3HAC078007-001 Revision: J

Advertisement

Table of Contents
loading

Table of Contents