ABB CRB 1100 Product Manual page 208

Table of Contents

Advertisement

5 Repair
5.3.1 Replacing the upper cable package
Continued
4
5
6
Continues on next page
208
Action
Loosen the screws and move the motor slightly
to slacken the timing belt.
Remove the screws and washers.
Carefully lift out the motor.
CAUTION
A cooling pad is attached to the motor, which may
stick to the casting. Always use a plastic sheet
with caution to remove the pad from the casting.
Pay attention not to scratch the casting or damage
the pad.
© Copyright 2021-2023 ABB. All rights reserved.
Note
xx1800003008
xx1800003009
Cooling pad location
xx1800003604
Product manual - CRB 1100
3HAC078007-001 Revision: J

Advertisement

Table of Contents
loading

Table of Contents