ABB CRB 1100 Product Manual page 205

Table of Contents

Advertisement

3
Separating the upper cable harness from the axis-2 gearbox
1
2
Product manual - CRB 1100
3HAC078007-001 Revision: J
Action
Valid for CRB 1100-4/0.58
Remove the plug screw and washer on the ex-
tender unit to access the cable package locking
screw on the axis-4 gearbox and then loosen the
locking screw.
Action
DANGER
Make sure that all supplies for electrical power,
hydraulic pressure, and air pressure are turned
off.
Remove the cable bracket.
© Copyright 2021-2023 ABB. All rights reserved.
5.3.1 Replacing the upper cable package
Note
xx1800003000
xx1800003001
Note
xx1800003002
Continues on next page
5 Repair
Continued
205

Advertisement

Table of Contents
loading

Table of Contents