ABB CRB 1100 Product Manual page 396

Table of Contents

Advertisement

5 Repair
5.6.1 Replacing the housing
Continued
3
Removing the process hub
1
2
3
Continues on next page
396
Action
DANGER
Turn off all:
electric power supply
hydraulic pressure supply
air pressure supply
to the robot, before entering the safeguarded
space.
Action
DANGER
Make sure that all supplies for electrical power,
hydraulic pressure, and air pressure are turned
off.
Remove the screws and carefully open the cover.
CAUTION
Be aware of the cabling that is attached to the
cover! The cover can not be removed completely
until the connectors are disconnected, as shown
in following steps.
Disconnect the air hoses.
© Copyright 2021-2023 ABB. All rights reserved.
Note
Note
xx2000002219
xx1800002945
Product manual - CRB 1100
3HAC078007-001 Revision: J

Advertisement

Table of Contents
loading

Table of Contents