5 Repair
5.3.1 Replacing the upper cable package
Continued
2
Securing the cable package to the swing
1
Refitting the axis-2 motor
1
Continues on next page
228
Action
Reconnect the connectors.
•
J2.C1
•
J2.C2
Tip
See the number markings on the connectors for
help to find the corresponding connector.
Action
Refit the cable bracket.
Action
Check that:
•
all assembly surfaces are clean and without
damages
•
the motor is clean and undamaged.
© Copyright 2021-2023 ABB. All rights reserved.
Note
xx1800002501
Note
Screw: M3x8 12.9 Lafre
2C2B/FC6.9 (2 pcs)
Tightening torque: 0.8 Nm
xx1800002499
Note
Product manual - CRB 1100
3HAC078007-001 Revision: J