MX–42
SST
MANUAL TRANSAXLE (S51)
(g)
Using SST and a torque wrench, measure the preload.
SST
Preload (at starting):
0.8 – 1.6 N·m (8 – 16 kgf·cm, 6.9 – 13.9 in.·lbf)
If the preload is not within the specification, remove the trans-
mission case side bearing retainer. Select another shim.
HINT:
The preload will change about 0.3 – 0.4 N·m (3 – 4 kgf·cm, 2.6
– 3.5 in.·lbf) with each 0.05 mm (0.0019 in.) change in shim
Z00620
thickness.
Mark
1
2
3
4
5
6
7
8
9
10
(h)
Remove the 6 bolts.
(i)
Remove the bearing retainer and shim.
(j)
Remove the 17 bolts.
(k)
Remove the transmission case.
–
DIFFERENTIAL CASE
09564–32011
Thickness mm (in.)
1.90 (0.0748)
1.95 (0.0768)
2.00 (0.0787)
2.05 (0.0807)
2.10 (0.0827)
2.15 (0.0846)
2.20 (0.0866)
2.25 (0.0886)
2.30 (0.0906)
2.35 (0.0925)
Author :
Mark
Thickness mm (in.)
11
2.40 (0.0945)
12
2.45 (0.0965)
13
2.50 (0.0984)
14
2.55 (0.1004)
15
2.60 (0.1024)
16
2.65 (0.1043)
17
2.70 (0.1063)
18
2.75 (0.1083)
19
2.80 (0.1102)
–
–
Date :
1892