Lucent DDM-2000 OC-3 User And Service Manual page 444

Tarp release 13 and later volume ii
Table of Contents

Advertisement

363-206-285
Issue 2, February 2000
DO ITEMS BELOW IN ORDER LISTED . . . . .FOR DETAILS, GO TO
At the DDM-2000 shelf, use the ent-ulsdcc-l3: command to
designate the NSAPAREA field and level 2 IS-IS routing, as
required.
At the FT-2000 shelf, use the
CONFIGURATION-Set-ULSDCC-L3 command to designate the
L3 Area address and Level 2 IS parameters, as required.
20.
NOTE:
The rtrv-pm-line: command in the following procedure
displays performance monitoring data associated with the
OC-3 or OC-12 lines terminated on the system.
Perform end-to-end OC-3 or OC-12 line test.
21. Repeat this procedure from Step 16 for all OC-3 or OC-12 optical
spans until the OC-3 or OC-12 ring is complete back to the host
FT-2000 shelf.
22.
NOTE:
Establishing service requires that the proper slots in each
terminating node be properly equipped with the correct
circuit pack(s) for the type of service being established. It
also requires numerous cross connections in each of the
nodes representing the path of the required service.
Additionally, transmission tests should be performed to verify
the continuity and quality of the established circuit.
The single-homed DDM-2000 OC-3 or OC-12 access network is
now ready for initial service to be established. For service
terminations on a FT-2000 shelf, use the procedures in
365-575-103, FT-2000 OC-48 Lightwave System, Release 8.1
Through 9.1, User/Service Manual , to establish those services.
For DS1, DS3, EC-1, HDSL, T1, STS3c, and/or LAN terminations
on a DDM-2000 OC-3 shelf, use the procedures in this
User/Service manual to establish those services.
DDM-2000 OC-3 M
System Turnup:
ULTIPLEXER
NTP-047
Page 8 of 12
DLP-515

Advertisement

Table of Contents
loading

Table of Contents