Lucent DDM-2000 OC-3 User And Service Manual page 151

Tarp release 13 and later volume ii
Table of Contents

Advertisement

363-206-285
Issue 2, February 2000
Establish EC-1 Dual Ring Interworking
DDM-2000 OC-3 to OC-12 or FT-2000
DO ITEMS BELOW IN ORDER LISTED . . . . .FOR DETAILS, GO TO
1.
!
CAUTION:
DDM-2000 circuit packs contain static sensitive components
which can be damaged by electrostatic discharge. A static
ground wrist strap must be worn when handling the circuit
packs. See electrostatic discharge considerations in Trouble
Clearing: TAD-100 .
NOTE:
This procedure treats the DRI EC-1 configuration as
separate components which use the cross-connections to
integrate the components into the DRI configuration. The
EC-1 Dual Ring Interworking (DRI) configuration is
established by first equipping the proper nodes with the
EC-1 interfaces and then establishing DS1/DS3 service
through the network. The procedures for establishing service
reference the proper cross-connection procedure (DLP-550)
for making the necessary cross-connections.
Establish Initial Low Speed EC-1 Interface
2.
Establish Initial End-to-End DS1 Service, if required.
3.
Establish Initial End-to-End DS3 Service, if required.
OC-3 Optical Fiber Spans
DDM-2000 OC-3 M
Circuit Order:
ULTIPLEXER
NTP-013
Page 1 of 2
NTP-034
NTP-004
NTP-005

Advertisement

Table of Contents
loading

Table of Contents