Lucent DDM-2000 OC-3 User And Service Manual page 294

Tarp release 13 and later volume ii
Table of Contents

Advertisement

363-206-285
Issue 2, February 2000
DO ITEMS BELOW IN ORDER LISTED . . . . .FOR DETAILS, GO TO
Ensure both TGS/TG3 circuit packs are installed. Then, use the
switch-sync:s=circuitpack,pri=manual command to
switch to the protection TGS/TG3 circuit pack, if not already
ACTIVE. Use rtrv-sync: command to verify that the TGS/TG3
circuit pack in TIMING slot 2 is ACTIVE. Unplug the TGS/TG3
circuit pack in TIMING slot 1.
11.
!
CAUTION:
This step will interrupt service until the optical lines have
been properly reconnected. Notify maintenance center and
other required personnel that service will be interrupted.
NOTE:
In the ring configuration, optical fibers from MAIN 1 at one
node connect to MAIN 2(P) at the adjacent node.
At Node 1, remove and reconnect the optical fibers as shown in
Figure 1.
Figure 1 – DDM-2000 OC-3 Point-to-Point to Ring Upgrade
DDM-2000 OC-3 M
Circuit Order:
ULTIPLEXER
NTP-030
Page 4 of 8

Advertisement

Table of Contents
loading

Table of Contents