Perform Test of RT Batteries Using
197A BATTERY LOAD TEST SET
!
1.
CAUTION:
Service interruption will occur if batteries are disconnected and AC power
is not available.
Obtain 197A BATTERY LOAD TEST SET (197A) and place near batteries to
be tested (Figure 1).
Figure 1 – 197A Battery Load Test Set Test Connections
DDM-2000 OC-3 M
Detailed Level Procedure:
ULTIPLEXER
DLP-536
Page 1 of 4