NTP-026
: Circuit Order
Page 10 of 10
DO ITEMS BELOW IN ORDER LISTED. . . . . FOR DETAILS, GO TO
22.
NOTE:
Shelves that are part of a subnetwork being partitioned into
multiple areas require that the NSAPAREA field and level 2
IS-IS routing parameters of the ent-ulsdcc-l3:
command be set. See Section 11 Commands and Reports
in 363-206-285, DDM-2000 OC-3 Multiplexer, TARP Release
13 and Later, User/Service Manual —Volume I , for an
explanation of the command parameters and 824-102-144,
Lucent Technologies 2000 Product Family, Operations
Interworking Guide For TARP Releases , for an explanation
of the engineering rules for subnetwork partitioning.
Use the ent-ulsdcc-l3: command to designate the
NSAPAREA field and level 2 IS-IS routing, as required.
23. Perform end-to-end OC-3 or OC-12 optical line test on optical
spans being established.
24.
NOTE:
Proper cross-connections must be made at each shelf to
establish the complete end-to-end path for the
DS1/DS3/EC-1 port being tested. After one path (ring1 or
ring2) has been tested, use the sw-path-( ): command
at both ends to test the other ring path.
Perform appropriate end-to-end transmission test for the circuits
being added, as required.
A.
Single Ring DS1 test
B.
Dual Ring Interworking (DRI) DS1 test
C. Single Ring DS3 test
D. Dual Ring Interworking (DRI) DS3 test
25. The system is now ready for initial service to be established.
Initial DS1 Service
Initial DS3 Service
Initial EC-1 Service
Initial HDSL Service
Initial LAN Service
Initial T1 Service
[System Turnup: NTP-004]
[System Turnup: NTP-005]
[System Turnup: NTP-034]
[System Turnup: NTP-003]
[System Turnup: NTP-028]
[System Turnup: NTP-033]
DDM-2000 OC-3 M
Issue 2, February 2000
ULTIPLEXER
363-206-285
DLP-515
DLP-510
DLP-554
DLP-511
DLP-553