Lucent DDM-2000 OC-3 User And Service Manual page 169

Tarp release 13 and later volume ii
Table of Contents

Advertisement

363-206-285
Issue 2, February 2000
DO ITEMS BELOW IN ORDER LISTED . . . . .FOR DETAILS, GO TO
18.
NOTE:
This procedure assumes that the DDM-2000 high speed
signals are looped back [manual optical (OLIU) loopback].
Perform local (looped back) transmission test (if required).
A. DS1/EC-1 transmission test
B. DS3/EC-1 transmission test
19.
NOTE:
This procedure assumes that the DDM-2000 has been
connected to the low-speed DSX cross-connection as
required.
Perform local cross-connect wiring test (looped back) (if required).
A. DS1/EC-1 transmission test
B. DS3/EC-1 transmission test
20. Perform DDM-2000 OC-3 receiver sensitivity test (if required).
Optional test.
21. Check office alarm interface as required.
22. Test protection switching function, if required.
23.
!
CAUTION:
The command init-sys:all may affect service. It should
never be used on an in-service system. It should be used
only after a shelf has been equipped to reset all
provisionable parameters and cross-connections to their
default values.
NOTE:
An inconsistent DCC values alarm will occur when the
init-sys:all command is executed because "fecom"
becomes enabled again. To clear the alarm, use the
set-fecom:address:com=disable to disable the DCC.
Use the init-sys:all command to initialize all provisionable
parameters to their original default values.
DDM-2000 OC-3 M
System Turnup:
ULTIPLEXER
NTP-016
Page 7 of 10
DLP-510
DLP-511
DLP-510
DLP-511
DLP-547
DLP-516
DLP-519