363-206-285
Issue 2, February 2000
Establish Initial End-to-End DS3 Service
(Group Equipped But Not In Service)
DO ITEMS BELOW IN ORDER LISTED . . . . .FOR DETAILS, GO TO
1.
!
CAUTION:
DDM-2000 circuit packs contain static sensitive components
which can be damaged by electrostatic discharge. A static
ground wrist strap must be worn when handling the circuit
packs. See electrostatic discharge considerations in Trouble
Clearing: TAD-100 .
NOTE:
The OC-3 system must be established before continuing
with this procedure. If all the nodes of the network have not
been equipped and installed, refer to System
Turnup/Circuit Order: IXL-001 for procedures to equip the
DDM-2000 shelves, and to establish a system.
NOTE:
This procedure assumes that DS3 circuit packs have already
been installed during the initial shelf turnup at the DS3
terminating end(s) of the circuit and either DS3 or STS1E
circuit packs have been installed during initial shelf turnup at
the other terminating end of the circuit. If the appropriate
circuit packs have not been installed and the system is in
service on other groups, refer to System Turnup/Circuit
Order: IXL-001 for procedures to add a new DS3 group for
DS3 service.
NOTE:
If the DDM-2000 fails to respond in the indicated manner,
refer to Trouble Clearing: IXL-001.
At the DS3 terminating node(s) of the circuit being established,
determine which DS3 port is to be put into service and what
options are to be selected.
DDM-2000 OC-3 M
System Turnup:
ULTIPLEXER
NTP-005
Page 1 of 4