Lucent DDM-2000 OC-3 User And Service Manual page 416

Tarp release 13 and later volume ii
Table of Contents

Advertisement

363-206-285
Issue 2, February 2000
DO ITEMS BELOW IN ORDER LISTED . . . . .FOR DETAILS, GO TO
14.
NOTE:
The rtrv-pm-line command in the following procedure
displays performance monitoring data associated with the
OC-1 lines terminated on the system.
Perform end-to-end OC-1 line test.
15. Repeat this procedure from Step 10 for all OC-1 optical spans
being established in the DDM-2000 OC-3/OC-1 or OC-12/OC-1
network. Ensure that the last optical span connected to the OC-3
host shelf is connected to an OLIU in the opposite slot as the one
in the first host OC-3 shelf (for example, slot 2(P) at one node and
slot 1 at the other node).
16. The dual-homed FiberReach access network is now ready for
initial service to be established.
Initial DS1 Service [System Turnup: NTP-004]
DDM-2000 OC-3 M
System Turnup:
ULTIPLEXER
NTP-044
Page 6 of 14
DLP-556

Advertisement

Table of Contents
loading

Table of Contents