Lucent DDM-2000 OC-3 User And Service Manual page 796

Tarp release 13 and later volume ii
Table of Contents

Advertisement

363-206-285
Issue 2, February 2000
NOTE:
Proper cross-connections must be made at each shelf to establish the
complete end-to-end path for the DS1 circuit being tested. TARP Release
13.0 or later has no default cross-connections and supports only manual
VT1.5 and STS-1 cross-connections. See the description of the following
commands in the Commands and Reports section of this manual:
cnvt-crs, dlt-crs-sts1, dlt-crs-vt1, ent-crs-sts1,
ent-crs-vt1, rtrv-crs-sts1, rtrv-crs-vt1, set-ne, and
rtrv-ne. See Cross-Connection Provisioning in the Administration and
Provisioning section of this manual for more information on
cross-connection provisioning.
NOTE:
A CIT is required for this test on a ring configuration because manual
cross-connections have to be made at all shelves.
Is a CIT available?
If YES, then continue with Step 2.
If NO, then proceed to Step 3.
2.
At the near-end DDM-2000, connect the CIT to the CIT jack on the User Panel,
if required.
Reference: DLP-521
3.
NOTE:
Work orders, office records, or CIT ent-crs-{sts1 or vt1} or
rtrv-crs-{sts1 or vt1} commands may be used to make or verify
cross-connections.
At each shelf in the network, make/verify that proper STS-1/VT1(DS1)
terminating and pass-through cross-connections have been made for each
DS1 circuit being tested, as required.
4.
Are you using CIT and test-trmsn-t1: command to perform this test?
If YES, then continue with Step 5.
If NO, then proceed to Step 21.
DDM-2000 OC-3 M
Detailed Level Procedure:
ULTIPLEXER
DLP-510
Page 2 of 8

Advertisement

Table of Contents
loading

Table of Contents