DO ITEMS BELOW IN ORDER LISTED . . . . .FOR DETAILS, GO TO
12.
NOTE:
Shelves that are part of a subnetwork being partitioned into
multiple areas require that the NSAPAREA field and level 2
IS-IS routing parameters of the ent-ulsdcc-l3:
command be set. See Section 11 Commands and Reports
in 363-206-285, DDM-2000 OC-3 Multiplexer, TARP Release
13 and Later, User/Service Manual—Volume I , for an
explanation of the command parameters and 824-102-144,
Lucent Technologies 2000 Product Family, Operations
Interworking Guide For TARP Releases , for an explanation
of the engineering rules for subnetwork partitioning.
Use the ent-ulsdcc-l3: command to designate the
NSAPAREA field and level 2 IS-IS routing, as required.
13.
NOTE:
The rtrv-pm-line: command in the following procedure
displays performance monitoring data associated with the
STS-3 lines terminated on the system.
Perform end-to-end OC-3 or OC-12 line test.
14. Repeat this procedure from Item 2 for each optical span being
established in the DDM-2000 OC-3 or OC-12 network.
15. The system is now ready for initial service to be established.
Initial DS1 Service
Initial DS3 Service
Initial EC-1 Service
Initial HDSL Service
Initial LAN Service
Initial T1 Service
[System Turnup: NTP-004]
[System Turnup: NTP-005]
[System Turnup: NTP-034]
[System Turnup: NTP-003]
[System Turnup: NTP-028]
[System Turnup: NTP-033]
DDM-2000 OC-3 M
System Turnup:
ULTIPLEXER
NTP-022
Page 6 of 8
DLP-515

Advertisement

Table of Contents
loading

Table of Contents