Seat Leon 2013 Workshop Manual page 99

Hide thumbs Also See for Leon 2013:
Table of Contents

Advertisement

4-cylinder petrol engine (1.2 l direct injection, 4 V, turbocharger, EA211) - Edition 02.2017
– Pull toothed belt upwards and fit it on idler roller -1-, tensioner
roller -2- and camshaft pulleys -3- and -4-.
– Using the ring spanner SW 30 - T10499- , turn the eccentric
-2- of the tensioning roller in the direction of the -arrow- until
the adjustment pointer -3- is positioned about 10 mm to the
right of the setting window.
– Turn eccentric adjuster back until adjustment indicator is posi‐
tioned exactly in adjustment window.
Note
Torque wrench - VAS 6583- must be used for tightening.
When setting the specified torque on the torque wrench - VAS
6583- , the length indicated on the insert tool - T10500- must
be entered in the torque wrench.
– Hold eccentric in that position and tighten bolt -1- to 25 Nm.
To do this, use insert tool, 13 mm - T10500- with torque wrench
- VAS 6583- .
⇒ "2.2 Exploded view - toothed belt", page 83
Note
Turning the engine further or running the engine may lead to slight
differences in the position of the adjustment indicator -3- in rela‐
tion to the adjustment window. This does not affect the toothed
belt tension or the timing.
– Tighten bolt -1- of toothed belt pulley initially to 50 Nm.
– Use counter-hold tool - T10172- with adapter -T10172/1- and
-T10172/2- to do this.
Protected by copyright. Copying for private or commercial purposes, in part or in whole, is not
permitted unless authorised by SEAT S.A. SEAT S.A does not guarantee or accept any liability with
respect to the correctness of information in this document. Copyright by SEAT S.A.
León 2013 ➤ , León ST 2013 ➤
2. Toothed belt drive
93

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Leon st 2013

Table of Contents