4-cylinder petrol engine (1.2 l direct injection, 4 V, turbocharger, EA211) - Edition 02.2017
– Turn tensioner in direction of -arrow- and remove locking pin
- T10060 A- .
– Release tensioner.
– Check that poly V-belt is properly seated.
– Start engine and check that poly V-belt runs properly.
1.2.2
Poly-V belt: Removing and installing,
vehicles with air conditioner compressor
Special tools and workshop equipment required
♦ Locking pin - T10060 A-
Removing
– To slacken poly V-belt, turn tensioner in anti-clockwise direc‐
tion -arrow-.
– Lock tensioner with locking pin - T10060 A- .
Note
If a used poly V-belt runs in the opposite direction when it is
♦
refitted, this can cause breakage.
Before removing the Poly-V belt, mark the direction of rotation
♦
with chalk or felt-tipped pen for re-installation.
– Remove the V-ribbed belt.
Installation
Installation is carried out in the reverse order. Please note the
following:
– Install the poly V-belt as depicted in the illustration:
1 -
Vibration damper
2 -
Tensioner for poly V-belt
3 -
Alternator
4 -
Air conditioning compressor
Protected by copyright. Copying for private or commercial purposes, in part or in whole, is not
permitted unless authorised by SEAT S.A. SEAT S.A does not guarantee or accept any liability with
respect to the correctness of information in this document. Copyright by SEAT S.A.
León 2013 ➤ , León ST 2013 ➤
1. Cylinder block (pulley end)
39