2 Installation and commissioning
2.3.5 Securing the base plate
Continued
2
3
4
5
6
7
8
9
70
Action
CAUTION
The base plate weighs 353 kg! All lifting
equipment used must be sized accordingly!
Position base plate in relation to the robot
work location using the grooves in the base
plate.
Lift the base plate to its mounting position.
Use the base plate as a template and drill at-
tachment holes as required by the selected
bolt dimension.
Fit the base plate and use the levelling bolts
to level the base plate.
If required, fit strips of sheet metal underneath
the base plate to fill any gaps.
Secure the base plate to the foundation with
screws and sleeves.
Recheck the four contact surfaces on the
base plate to make sure the base plate is
levelled and flat.
If it is not, use pieces of sheet metal or similar
to bring the base plate to a levelled position.
© Copyright 2012-2018 ABB. All rights reserved.
Note
Shown in figure
Base plate, orienting
grooves and leveling bolts on page
Detailed in section
Lifting the base plate
on page
65.
Attachment holes: 16 pcs.
Shown in figure
Base plate, orienting
grooves and leveling bolts on page
Maximum allowed deviation all over the
base plate, from one contact surface to
the other: 0.3 mm.
Product manual - IRB 460
3HAC039842-001 Revision: P
68.
68.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Irb 460-110/2.4

Table of Contents