ABB IRB 460 Series Product Manual page 236

Table of Contents

Advertisement

4 Repair
4.4.5 Replacing linkage - lower link arm
Continued
4
5
Continues on next page
236
Action
Remove the locking washer.
Remove the lower link arm by lifting it straight
out.
A three legged bearing puller will be needed
to remove the link arm from the link. To re-
move it from the frame a plastic mallet can
be used.
Note
If needed use a plastic mallet to remove the
lower link arm.
© Copyright 2012-2018 ABB. All rights reserved.
Note
xx1100000171
xx1100000174
Product manual - IRB 460
3HAC039842-001 Revision: P

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Irb 460-110/2.4

Table of Contents