Revision
B
C
D
E
F
Product manual - IRB 460
3HAC039842-001 Revision: P
Description
•
Three legged bearing puller added in Required equipment sections
Replacing linkage - upper link arm on page 225
- lower link arm on page
•
Replacing method updated in section
3 on page
294.
•
Text updated in section
•
In previous section Replacing the axis 2 and 3 gearboxes, replacing
gearbox axis 3 has been removed and now only describes the axis 2
gearbox.
•
New section included Replacing the axis 3 gearbox.
•
Changed the weight of the robot, see
•
Added an illustration that shows the directions of the robot stress
forces, see
Loads on foundation, robot on page
•
Added new section about how to install the signal lamp, see
of signal lamp, upper arm (option) on page
•
Added information that the working range of axis 1 also can be restric-
ted by EPS, see
Introduction on page
•
Special tools updated.
This revision includes the following updates:
•
Minor corrections and editorial changes made throughout the manual.
•
Some general tightening torques have been changed/added, see up-
dated values in
Screw joints on page
•
Added steps in the instruction for replacing upper end of cabling, see
Replacing the cable harness, upper end (incl. axis 6) on page
•
Added
Safety risks during handling of batteries on page
This revision includes the following updates:
•
The maximum allowed deviation in levelness of the base plate is
changed, see
Securing the base plate on page
•
Reference to Hilti standard added to the foundation recommendation
for the base plate and class designation for foundation is changed to
european standard C25/C30 (previously Swedish standard K25/K30),
see
Securing the base plate on page
•
All data about type of lubrication in gearboxes is moved from the
manual to a separate lubrication manual, see
in gearboxes on page
•
Added a new sealing structure that contains a support ring, o-ring and
radial sealing at the link, see
and
Replacing the upper arm on page
•
Three o-rings are added to the equipment list and procedure in section
Replacing the axis 1 gearbox on page
•
A new SMB unit and battery is introduced, with longer battery lifetime.
This revision includes the following updates:
•
A new procedure is added to the manual:
cooling fan for axis-1 motor on page
•
The position of the battery holder for RMU lithium battery (3-pole
battery contacts) has changed. The figures and text has been updated.
This revision includes the following updates:
•
Added information about risks when scrapping a decommissioned
robot, see
Scrapping of robot on page
This revision includes the following updates:
•
New illustrations added for lower arm and lower and upper arm joints.
•
The maximum allowed deviation in levelness of the base plate and
foundation is changed, see
•
Minor corrections.
© Copyright 2012-2018 ABB. All rights reserved.
Overview of this manual
and
233.
Replacing motors, axes 2 and
Replacing the axis 1 gearbox on page
Weight, robot on page
80.
90.
379.
66.
66.
Type and amount of oil
121.
Replacing the linkage - link on page 240
209.
313.
Option 87-1 - Installing the
84.
373.
Securing the base plate on page
Continues on next page
Continued
Replacing linkage
313.
48.
49.
Installation
157.
35.
66.
11