Installation Checklist - Rotax 915 i A series Maintenance Manual

Hide thumbs Also See for 915 i A series:
Table of Contents

Advertisement

INSTALLATION CHECKLIST

The following installation checklist must be copied and filed in during power plant/engine installation.
Aircraft
Type
Serial number
Registration number
Manufacturer
Engine
Type
Serial number
FUSE BOX serial number
ECU part no. (S/N)
Manufacturer
Specifications/version
Miscellaneous data
Installation date
Mechanic (surname and forename)
Installation-related point
Control unit (ECU) checked for damage and corro-
sion. Insulated construction checked.
Fuse unit (FUSE BOX) checked for damage and
corrosion. Fuses checked.
Fuse unit (FUSE BOX) connections checked for
secure connection.
See also
Chapter 71–00–00 section Power
Protective coverings removed.
Fuel filters/prefilters on the aircraft frame side
cleaned.
All fuel tanks and fuel lines cleaned.
71–00–00
Page 4
August 01 2018
BRP-Rotax
MAINTENANCE MANUAL HEAVY
Installation checklist for power plant assy./engine 915 iS
plant..
BRP-Rotax GmbH&Co KG, 4623 Gunskirchen,
Austria
OK
Remark
Effectivity: 915 i A Series
Edition 0/Rev. 0

Advertisement

Table of Contents
loading

Table of Contents