Rotax 915 i A series Maintenance Manual page 342

Hide thumbs Also See for 915 i A series:
Table of Contents

Advertisement

NOTE
Align the spring type hose clamp 25 so that it is
2 mm (0.0787 in.) away from the spring type
hose clamp on preformed hose 3.
Step
Procedure
7
Push on preformed hose 1 and align it
horizontally like preformed hose 3.
Figure 14.32
1
Preformed hose 1
Expansion tank
3
Figure 14.33
1
Preformed hose 1
Expansion tank
3
75–00–00
Page 24
August 01 2018
BRP-Rotax
MAINTENANCE MANUAL HEAVY
2
Preformed hose 3
2
Preformed hose 3
Spring type hose
4
clamps
Step
Procedure
8
Install the spring type hose clamp 25 on
preformed hose 4.
NOTE
Align the spring type hose clamp 25 so that it
does not come into contact with the other spring
type hose clamps.
Step
Procedure
9
Push on preformed hose 4 and align it
horizontally like preformed hoses 3 and 1.
NOTE
Preformed hose 4 is symmetrical.
Figure 14.34
Spring type hose
1
clamp 25
Expansion tank
3
Step
Procedure
10
Install the spring type hose clamp 25 on
preformed hose 2 and position it
vertically.
11
Push on preformed hose 2 and align it
horizontally.
2
Preformed hose 4
Effectivity: 915 i A Series
Edition 0/Rev. 0

Advertisement

Table of Contents
loading

Table of Contents