Rotax 915 i A series Maintenance Manual page 373

Hide thumbs Also See for 915 i A series:
Table of Contents

Advertisement

FUSE BOX
Preparation
Before the fuse box is removed, the work and checks
described below must be carried out to identify any
further malfunctions in the engine and rectify them as
part of the repair work.
General visual inspection.
See Maintenance Manual Line for the en-
gine type 915 i A Series Chapter 05–00–
00 and 12–00–00.
FUSE BOX — REMOVAL
Step
Procedure
1
Unplug the engine wiring harness and
grounding connectors from the fuse box.
See
Chapter 76-50-00 section Wiring
harness.
2
Unplug the aircraft wiring harness.
ATTENTION
Removal must be carried out according to the
aircraft manufacturer's instructions.
Step
Procedure
3
Remove the attachment screws of the
fuse box according to the aircraft manu-
facturer's specifications. Remove the
fuse box.
REGULATOR B — REMOVAL
Step
Procedure
1
Loosen the gasket screw connection.
Wrench size A/F 30.
Effectivity: 915 i A Series
Edition 0/Rev. 0
BRP-Rotax
MAINTENANCE MANUAL HEAVY
Figure 16.3
Regulator B
1
Step
Procedure
2
Remove the cover. Loosen 9 M4 Allen
screws along with plastic washer. Allen
wrench A/F 3 mm.
Figure 16.4
Regulator A
1
3
Cover
5
M4 Allen screws
Cap nut of the gasket
2
screw connection
Regulator B
2
4
Plastic washer M4
76–20–00
Page 5
August 01 2018

Advertisement

Table of Contents
loading

Table of Contents