Rotax 915 i A series Maintenance Manual page 46

Hide thumbs Also See for 915 i A series:
Table of Contents

Advertisement

Thread locker for
stud installation
Thread locker application for stud installation in blind holes.
Figure 1.7: Application for stud installation in blind holes
Step
NOTE
To avoid a hydro lock situation, do not apply too much LOCTITE.
Step
00–00–00
Page 26
August 01 2018
BRP-Rotax
MAINTENANCE MANUAL HEAVY
1
On stud threads
On retaining nut threads
3
Procedure
1
Clean threads (stud and hole) with solvent.
2
Apply LOCTITE 7063 on threads and allow to dry.
3
Put 2 or 3 drops of proper strength LOCTITE thread locker on female
threads and in hole.
Procedure
4
Apply several drops of proper strength LOCTITE on stud threads.
5
Install stud.
6
Install cover, part, etc.
7
Apply a few drops of proper strength LOCTITE on uncovered stud threads.
8
Install and tighten retaining nut(s) as required.
2
On threads and in the hole
Effectivity: 915 i A Series
Edition 0/Rev. 0

Advertisement

Table of Contents
loading

Table of Contents