Finishing Work - Rotax 915 i A series Maintenance Manual

Hide thumbs Also See for 915 i A series:
Table of Contents

Advertisement

Figure 11.90: PCV hoses
Pressure control
1
valve
Connection valve cov-
3
er – PCV
Connection turbo-
5
charger – PCV

FINISHING WORK

Fill the fuel and coolant systems.
See Maintenance Manual Line for the en-
gine type 915 i A Series Chapter 12-20-00
section Planned maintenance.
• Install the Bowden cable on the throttle body.
• Adjustment of the throttle position, sensor position
and idle speed.
73–10–00
Page 48
August 01 2018
BRP-Rotax
MAINTENANCE MANUAL HEAVY
2
Pop-off valve
Connection pop-off
4
valve – PCV
Effectivity: 915 i A Series
Edition 0/Rev. 0