Rotax 915 i A series Maintenance Manual page 200

Hide thumbs Also See for 915 i A series:
Table of Contents

Advertisement

Figure 8.16
1
Screw M6x20
O-ring 19x2
3
Step
Procedure
5
Heat the coolant elbow and elbow flange
with a hot air gun to max. 120 °C (248 °
F).
6
Remove the coolant elbow.
7
Remove adhesive residues in the bore
and check the thread.
72–30–00
Page 14
August 01 2018
BRP-Rotax
MAINTENANCE MANUAL HEAVY
2
Elbow flange
Effectivity: 915 i A Series
Edition 0/Rev. 0

Advertisement

Table of Contents
loading

Table of Contents