Installation Of Propeller Gearbox - Rotax 912 i Series Maintenance Manual

Line maintenance
Hide thumbs Also See for 912 i Series:
Table of Contents

Advertisement

Figure 5.5

INSTALLATION OF PROPELLER GEARBOX

Preparation
• Clean and degrease all parts carefully.
• Remove LOCTITE adhesive residue with LOCTITE 7063.
• Visual inspection of the crankshaft on the power take off side.
05–50–00
Page 6
September 01/2018
MAINTENANCE MANUAL LINE
1
Crankshaft
3
Friction washer
No hammering or pressing! The drive gear must only be pushed on manually.
Ensure that the friction washer is in the correct installation position.
The dog and drive gears are in pairs.
Only use parts with the same serial number.
BRP-Rotax
2
4
ATTENTION
ATTENTION
ATTENTION
Drive gear
Hex. nut M30x1.5
Effectivity: 912 i Series
Edition 2/Rev. 0

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

912 is sport912 is912 isc sport

Table of Contents