Assembly Of The Propeller Gearbox Assy - Rotax 915 i A series Maintenance Manual

Hide thumbs Also See for 915 i A series:
Table of Contents

Advertisement

1
Clutch hub
Circlip
3
Figure 6.63
ASSEMBLY OF THE PROPELLER
GEARBOX ASSY.
Damper clutch— installation
Step
Procedure
1
Install the whole gearbox to support plate
part no. 276958 and fix both in a bench
vice.
2
Lubricate the propeller shaft with LOC-
TITE ANTI SEIZE on the gear-tooth.
3
Install damper clutch into the housing.
NOTE
There is only one position to install the damper
clutch. It is indexed through the splines of the
propeller shaft.
72–10–00
Page 40
August 01 2018
BRP-Rotax
MAINTENANCE MANUAL HEAVY
2
Insertion jig
Figure 6.64
Support plate part no.
1
276958
Damper clutch assy.
3
Overload clutch — installation
Step
Procedure
1
Lubricate LOCTITE ANTI SEIZE on the
gear-tooth.
2
Install overload clutch so, that the marks
of torsion bar and carrier of the clutch are
properly aligned.
2
Gearbox
Effectivity: 915 i A Series
Edition 0/Rev. 0

Advertisement

Table of Contents
loading

Table of Contents