ABB Robotics IRB 4600 Manual page 92

Table of Contents

Advertisement

2 Installation and commissioning
2.5.3 Installing an expansion container
Continued
5
6
7
8
9
10
11
Continues on next page
92
Action
Fit a plastic plug in the expansion container
drain hole.
Fill the expansion container with oil.
Apply locking liquid to the three screw holes
in the expansion container.
Knock in the VK-cover with a rubber mallet.
Secure with three screws and washers.
Remove the plastic plug.
Apply some grease on the small o-ring and
place it in the recess on the expansion con-
tainer.
Place the expansion container in the base
and place it so the drain holes match.
Tip
Turn and install the container quickly to avoid
oil spill.
Secure the expansion container with the at-
tachment screws and washers.
Wipe off any oil residuals before continuing.
© Copyright 2009-2021 ABB. All rights reserved.
Information
xx1500001956
Oil volume: 0.4 l
Locking liquid: 3HAB7116-1 (Loctite 243).
Screws: M6x8 (3 pcs).
xx1500001957
xx1500001956
xx1500001959
Tightening torque 6 Nm.
Product manual - IRB 4600
3HAC033453-001 Revision: Y

Advertisement

Table of Contents
loading

Table of Contents