ABB OmniCore IRB 6720 Product Manual page 317

Table of Contents

Advertisement

Refitting the cable harness in the base
1
2
3
Product manual - IRB 6720
3HAC085697-001 Revision: C
Action
Run the robot cable harness through the
frame recess and down through the protec-
tion tube. Guide the SMB cables into the
SMB recess at the same time.
Run the cabling through the base.
Make sure that the cables are not
twisted. Each cable must be in line
with its position on the base plate.
Make sure that the R1.SMB cable
will run on the correct side of the
R1.MP1, see the figure.
Make sure that the markings on the cables
are facing the base cover, when connected.
© Copyright 2023 ABB. All rights reserved.
5.6.2 Refitting the cable harness
Note
xx2200001923
xx2200001924
xx1300000736
Continues on next page
5 Repair
Continued
317

Advertisement

Table of Contents
loading

Table of Contents